04

Vivo Energy/Nampala Gold Mines

Mali

Challenges

Extreme remote location of a mine with a completely off-grid solution

Integration with 6 existing DGs currently in operation

Single Axis Tracker and Bifacial Modules used to increase the PV generation in the available land area and footprint

Key Highlights

Saving 2 Mn Liter of diesel per annum which is 30% of the client’s diesel consumption per year

Reduction of Carbon 6000 Ton of CO2 per annum

Mobile design of the plant, equipment can be moved to another location after 5 years

Business Vertical

Renewable Energy

28.6 MWp Solar Power Plant

Digos City, Philippines

450 MWp Solar Power Plant

Rajasthan, India