Nampala Gold Mines, Mali

Sikasso, Mali

Status

Commissioned

Carbon emissions saved

6,000 tCO2 annually

Scope of Work

Turnkey EPC of 3.85 MWp Solar PV + 2.58 MWhr BESS integration into existing DG Network

Challenges

Extreme remote location of a mine with a completely off-grid solution

Integration with 6 existing DGs currently in operation

Single Axis Tracker and Bifacial Modules used to increase the PV generation in the available land area and footprint

Key Highlights

Saving 2 Mn Liter of diesel per annum which is 30% of the client’s diesel consumption per year

Reduction of Carbon 6000 Ton of CO2 per annum

Mobile design of the plant, equipment can be moved to another location after 5 years