22.32 MWp Solar Power Plant

Clark Freeport Zone, Philippines

Status

Commissioned

Duration

4 months

Scope of Work

Turnkey EPC

Key Highlights

Deployed a three-legged module, mounting the structure with a combination of concrete ballast and pilling foundations to make the project site flood resistant

Conducted a detailed flood analysis and installed outdoor inverter stations with RCC beams to tackle the soft, mushy soil