22.32 MWp Clark Freeport Zone Solar Power Plant

Luzon, Philippines

Status

Commissioned

Duration

4 months

Homes powered

40,000

Number of people who worked on the project

500

Scope of Work

Turnkey EPC

Key Highlights

Deployed a three-legged module, mounting the structure with a combination of concrete ballast and pilling foundations to make the project site flood resistant

Conducted a detailed flood analysis and installed outdoor inverter stations with RCC beams to tackle the soft, mushy soil

Business Vertical

Renewable Energy

1,177 MWp Noor Abu Dhabi Solar Power Plant, UAE

Abu Dhabi, UAE

14 MWp Solar Power Plant

Maharashtra India