Rajarhat IT Park Limited

Kolkata, India, 2017

Duration

36 months

Project Description

HVAC and Basement Ventilation System – 2 x 600 USGPM Primary CHW pumps, 2 x 830 USGPM Secondary CHW pumps, 2 x 1000 USGPM CW pumps, FRP CT, AHU, FCU, Piping, Ducting, Insulation, 21 x 33500 CFM Parking Ventilation fans, Lift-well/Staircase Pressurization System, Centrifugal fans and allied works. Plumbing and Firefighting work – 2 x 2850 LPM Fire main pumps, 2 x 180 LPM Jockey pumps, Diesel engine pump set, 3 x 250 LPM Hydropneumatic pumps, 8 x 400 LPM Sump pumps, Fire Hydrant System, Automatic Sprinkler System, Fire hose cabinet, Fire extinguishers, Sanitary fixtures, Rainwater piping and allied works.