For representation purposes only

Steel Authority of India

Bhilai, Chhattisgarh, India, 2022

Industry

Steel

Project

Quality assurance and quality control facility (Package no. 90A).

Scope of Work

The project consist of construction of 3 nos. laboratory buildings:

BF8 SMS III Building: G+2 2,016.00 SQM

Rolling Mill Building: G+1 2,394.00 SQM

RMP Lab Building: G 159.56 SQM.

TOTAL: 4569.56 SQM

Detail Engineering: Civil and MEP, civil construction works; electrical supply & installation; ac systems supply & installation; parking lot construction; external road works and land scaping.

Equipment Supplies: Spectrometric analysis & sample preparation equipment’s/ machine’s; metallographic examination & sample preparation equipment’s/ machine’s; mechanical sample testing/ sample preparation equipment’s / machine’s; physical testing/ sample preparation equipment’s/ machine’s; conventional analytical equipment’s; material handling equipment’s.

Business Vertical

Industrial EPC

Air Products

Chennai and Durgapur, India

Gerdau Steel India Pvt. Ltd

Andhra Pradesh, India