wipro-campus-noida

Project Brief:

Wipro constructed a state of the art Green building at their campus in Greater Noida in SEZ zone. Sterling and Wilson was entrusted with the MEP responsibility for this prestigious project. The project was one of the largest installation of chilled beams.

Our Scope:

  • Electrical: The Scope of electrical work comprises of SITC of 33KV HT Panel, 2nos. 7.5MVA 33/11KV Transformers, 11KV HT Panels, 2nos. 1600KVA 11/0.415KV Transformers, HT & LT Cabling, substation safety equipments, LT Panels, Bus-Ducts, Bus Bar Trunking, Distribution boards, Cable Trays, Raceways, External lighting, Point wiring, Earthing and Lightning Protection System & ITC of Light Fixtures.
  • HVAC: The scope of work was to supply, install and commission the low side equipment such as air handling units, chilled and condenser water pumps, fresh air units, fan sections, Variable frequency drives, variable air volume dampers, air distribution products, ducting, insulation, etc.
    The air-conditioning of the building was done by using the variable water flow system to make the building energy efficient. The Low side equipment such as Air handling units is operated with the variable frequency drives. Air distribution is done by using Variable air volume flow system and chilled beams to optimize the cost of the building operation
  • Fire Fighting: Fire Sprinkler System , Hydrant System, Fire Extinguisher
  • Plumbing: Sanitary, Internal & External Water System, Sewage, Drainage System

Project Name

WIPRO – CAMPUS, Greater Noida (Educational Institute)

Location

Greater Noida

Duration

5 months

Consultants

AECOM

Scope of Work

Electrical, HVAC, Fire Fighting, Plumbing