Hindustan-Coca-Cola-Beverag

Project Brief:

HCCBPL is the largest bottling partner of The Coca-Cola Company in India. It is a part of The Coca-Cola Company’s Bottling Investments Group and responsible for the manufacture, package, sale and distribution of beverages under the trademarks of The Coca-Cola Company. The company operates 24 bottling plants in various states across the country. It holds about 65 percent share of the bottling operations for Coca-Cola in India and serves over a million outlets.
For their Bidadi, Karnataka bottling plant, HCCBPL was looking for a turnkey solution provider for the supply, installation & commissioning of electrical power & distribution system for new high speed sparkling PET line at the plant. Sterling and Wilson was chosen as a preferred partner for the same after several rounds of discussions.

Our Scope:

  • Electrical: Scope which includes Power sanction to Commissioning and handing over of system
  • All approvals from KPTCL, PTCC, Railways, Bescom, KIADB, Etc.
  • Supply, Installation, testing & Commissioning of 66KV Equipment such as Isolator, SF6 breakers, Transformers, CTs, PTs, Control & Relay panels at KPTCL & Coca Cola Premises
  • Approx 2km of 4 runs of UG 66KV cabling between Coca Cola & KPTCL 220/66KV substation

Providing 66KV Substation with Tapping and associated 11KV, 415 Volts LT Works for Coca- Cola Existing Bidadi Plant. Detailed Brief is as follow. 66/11KV substation has its own control room which has 11 KV distribution panels, control panels & Battery chargers. These 11 KV panels are feeding to 2 load centers / utility blocks. Both the utility blocks have distribution transformers of various capacities. Main LT Panels are located in ground floor of utility block and feeding to various production panels. These production MCCs are located in various places according to the requirements. These Panels are providing power to various botteling lines. Entire expansion of Plant Electrification was included in the package , which includes cabling , earthing, lightning protection , lighting, small power etc.

Project Name

Hindustan Coca Cola Beverages Pvt. Ltd.

Location

Bidadi, Karnataka

Duration

8 months

PMC

M/s Potential Semac

Consultants

M/s Potential Semac

Scope of Work

66KV substation related works