Project Brief:

O.Y.S.T.E.R.S Water Park is unit of IRAL Appu Ghar covering 60 acres of land, located near Huda city center metro station, Gurgaon. It has consistently enjoyed a healthy occupancy rate of ~99% and holds the record for the highest number of footfalls (3,65,000 in a day). O.Y.S.T.E.R.S Water Park have Rain dance, Wave Pool, Lazy & Crazy River. It has OH my Gurgaon and Sky fall rides. It has a theme for converting the water park into a snow park as well as a heated water park in the winters. It has an excellent recall value, of an average of 1.4 million visitors annually. It is very soon coming up with a family entertainment center and a shopping arcade as well.

Sterling and Wilson was entrusted with responsibility of supply, installation, testing and commissioning of N/W, CCTV, Access control, PA, Music for rain dance & EPBAX system.

Our Scope: LVS:

EPBAX System, Networking, PAS, CCTV, Attendance System, Security Devices, Display System, Music System

  • SITC of Data Networking system (MAKE: CISCO) is consist of More than 1000 LAN point. Switches are interconnected through optical fibre. LAN point are used for Used for server interconnection VOIP ,WIFI system, billing system ,Tripod, access control, IP CCTV
  • SITC of Public address system (PA system) is an electronic amplification and distribution system with a microphone, amplifier and speakers used to allow a person to address and evacuate the Park in case of fire
  • SITC of Closed-circuit television (CCTV) is the use of video cameras to transmit a signal to a specific place. CCTV consists of 60+ IP cameras for surveillance in multiple areas of the Park
  • SITC of EPBAX System (MAKE: Panasonic) consists of analog as well as Digital phone which is interconnected to Noida water park through VOIP
  • SITC of Music System (MAKE: BOSE) is used by DJ for entertainment at water park

Project Name

OYSTERS Water Park Gurgaon

Location

Gurgaon

Project Duration:

1 year

Consultants

Fourth Dimension Architect Private Ltd., Pune

Scope of Work:

LVS